• 2020 Bond Roof Projects 

    The 2020 èßäapp¹ÙÍø School Improvement Bond provided $65,700,000 to address èßäapp¹ÙÍø roofing needs that are currently critical or will become critical over the next several years. Roof replacements often include ancillary scope of work including roof level seismic improvements, additional building insulation, replacing outdated rooftop equipment, and other upgrades.

    2020 Bond completed roof projects:

    Ainsworth Annex Completed 2022
    Roof/Seismic w/ Fall Protection - Partial re-roof of the school building. Work included replacing skylights, flashings and sheet metal, with seismic upgrades including parapet bracing, strengthening roof decks and improving roof to wall connection. All portions of the roof will have OSHA -compliant fall protection equipment incorporated into the final design.

    Ceasar Chavez Completed 2022
    Roof/Seismic w/ Fall Protection - Partial re-roof of the school building. Work included replacing skylights, flashings and sheet metal, with seismic upgrades including parapet bracing, strengthening roof decks and improving roof to wall connection. All portions of the roof will have OSHA -compliant fall protection equipment incorporated into the final design.

    Duniway Completed 2023
    Roof/Seismic w/ Fall Protection - Partial re-roof of the school building. Work included replacing skylights, flashings and sheet metal, with seismic upgrades including parapet bracing, strengthening roof decks and improving roof to wall connection. All portions of the roof will have OSHA -compliant fall protection equipment incorporated into the final design.

    Glencoe Completed 2023
    Glenco roof work in progress
    Roof/Seismic w/ Fall Protection - Partial re-roof of the school building. Work included replacing skylights, flashings and sheet metal, with seismic upgrades including parapet bracing, strengthening roof decks and improving roof to wall connection. All portions of the roof will have OSHA -compliant fall protection equipment incorporated into the final design.

    Markham Completed 2023
     Completed Markham roof
    Roof/Seismic w/ Fall Protection - Partial re-roof of the school building. Work included replacing skylights, flashings and sheet metal, with seismic upgrades including parapet bracing, strengthening roof decks and improving roof to wall connection. All portions of the roof will have OSHA -compliant fall protection equipment incorporated into the final design.

    Meek Completed 2023
    Roof/Seismic w/ Fall Protection - Partial re-roof of the school building. Work included replacing skylights, flashings and sheet metal, with seismic upgrades including parapet bracing, strengthening roof decks and improving roof to wall connection. All portions of the roof will have OSHA -compliant fall protection equipment incorporated into the final design.

    MLC Completed 2023
    Roof/Seismic w/ Fall Protection - Partial re-roof of the school building. Work included replacing skylights, flashings and sheet metal, with seismic upgrades including parapet bracing, strengthening roof decks and improving roof to wall connection. All portions of the roof will have OSHA -compliant fall protection equipment incorporated into the final design.

    Reike Completed 2023
    New roof at Rieki
    Roof/Seismic w/ Fall Protection - Complete roof replacement with sheathing upgrade and improvements on the entire main building roof.  Cleaning and elastomeric recoating of the gym roof, complete roof replacement and insulation of the annex building. Work included replacing skylights, flashings and sheet metal, with seismic upgrades including parapet bracing, strengthening roof decks and improving roof to wall connection. All portions of the roof will have OSHA -compliant fall protection equipment incorporated into the final design.

    Richmond Completed 2023
    RIchmond roof in progress
    Roof/Seismic w/ Fall Protection - Partial re-roof of the school building. Work included replacing skylights, flashings and sheet metal, with seismic upgrades including parapet bracing, strengthening roof decks and improving roof to wall connection. All portions of the roof will have OSHA -compliant fall protection equipment incorporated into the final design.

    Skyline Completed 2023
    Roof work at Skyline school
    Roof/Seismic w/ Fall Protection - Partial re-roof of the school building. Work included replacing skylights, flashings and sheet metal, with seismic upgrades including parapet bracing, strengthening roof decks and improving roof to wall connection. All portions of the roof will have OSHA -compliant fall protection equipment incorporated into the final design.

    Vernon Completed 2024
    Roof/Seismic w/ Fall Protection - Partial re-roof of the school building. Work included replacing skylights, flashings and sheet metal, with seismic upgrades including parapet bracing, strengthening roof decks and improving roof to wall connection. All portions of the roof will have OSHA -compliant fall protection equipment incorporated into the final design.

    West Sylvan Completed 2024
    West Sylvan finsihed roof
    Roof/Seismic w/ Fall Protection - Partial re-roof of the school building. Work included replacing skylights, flashings and sheet metal, with seismic upgrades including parapet bracing, strengthening roof decks and improving roof to wall connection. All portions of the roof will have OSHA -compliant fall protection equipment incorporated into the final design.

    Winterhaven Completed 2024
    Roof/Seismic w/ Fall Protection - Partial re-roof of the school building. Work included replacing skylights, flashings and sheet metal, with seismic upgrades including parapet bracing, strengthening roof decks and improving roof to wall connection. All portions of the roof will have OSHA -compliant fall protection equipment incorporated into the final design.