Lincoln Project Documents
-
Lincoln Design Advisory Group (DAG)
The goal of the Lincoln DAG is to develop comprehensive, equitable, integrated and visionary high school campus plans and schematic designs with authentic school community engagement. The DAG will consist of a group of parent, teacher, student, and community stakeholder representatives who will be involved in the development of the design of the modernized Lincoln High School.
Read the Lincoln (DAG) Charter | Español |ÖÐÎÄ
Read the Lincoln (DAG) Code of Conduct | Español | ÖÐÎÄDAG #1 Mtg. Presentation 2-1-18
DAG #1 Mtg. Minutes 2-1-18DAG #2 Mtg. Presentation 3-8-18
DAG #2 Mtg. Minutes 3-8-18DAG Q&A Mtg Minutes 4-12-18
Capital construction status 4-12-18DAG #3 Mtg. Minutes 6-28-18
DAG #3 Mtg. Presentation 6-28-2018DAG #4 Mtg. Minutes 7-19-18
DAG #4 Mtg. Presentation 7-19-2018DAG #5 Mtg. Minutes 8-30-18
DAG #5 Mtg. Presentation 8-30-2018DAG #6 Mtg. Minutes 9-27-18
DAG #6 Mtg. Presentation 9-27-2018DAG #7 Mtg. Minutes 1-24-19
DAG #7 Mtg. Presentation 1-24-19DAG #8 Mtg. Minutes 3-14-19
DAG #8 Mtg. Presentation 3-14-19The Lincoln Master Planning Committee (MPC)
The Lincoln (MPC) was a group of school and community stakeholder representatives who worked together to help provide feedback for the Lincoln master plan. View The Lincoln Master Planning Committee (MPC) Roster Español | §²§å§ã§ã§Ü§Ú§Û | ÖÐÎÄ
MPC members also synthesized community-wide input and shared the evolving details of the project to others in the community. While MPC members did not make decisions, their input was crucial in creating a design that the entire Lincoln community can be proud of. Read the Lincoln MPC charter here.
MCP #1 Presentation 12-9-15
MCP #1 Mtg. Minutes 12-9-15
MPC#1 Draft Vision Statements
MPC#1 Vision Element PhotosMCP #2 Presentation 1-13-16
MCP #2 Mtg. Minutes 1-13-16
Marcia Latta Outreach Presentation at MPC#2Design Workshop #1 Presentation 1-16-16
MCP #3 Presentation 2-10-16
MPC#3 Mtg. Minutes 2-10-16
MPC#3 2016 Bond Lay of the Land Presentation
MPC#4 Mtg. Minutes 3-9-16
MPC#4 MPC4_LHS design criteria poster_
Bora_LHS Master Plan Schemes 3-9-16
MPC4_existing LHS building analysis
MPC4_MPC groups design ideas report
MPC4_select space program adjustmentsMPC#5 Mtg. Minutes 4-6-16
MPC#5 attachment MP Options 4-6-16
MPC#5 attachment MP Score Cards 4-6-16LHS MP Workshop #2 Summary (3_12_16)
MPC#6 Mtg. Minutes 5-4-16
LHS Final Story PresentationMPC#7 Mtg. Minutes 12-7-16
Lincoln Grand Opening SM Email 8-29-21 ESP
Lincoln Grand Opening SM Email 8-29-21 RUS
Lincoln Grand Opening SM Email 8-29-21 CHI